[DG.GBD-NW-AN.BST-KSDSTEIN.VKB001] Germany – Institutional buildings – Sand-lime bricks – Estimated costs of the construction
Retrieved by DBnomics on April 2, 2026 (11:19 AM)
- from
- 2015=386,689
- to
- 2025=301,206
- min:
- 301,206
- max:
- 810,896
- avg:
- 540,574.364
- σ:
- 133,781.18
Loading chart