DBnomics, the world's economic database

[tgs00113] Rail network by NUTS 2 region

Updated by provider on May 20, 2025 (9:00 PM).

Documentation
Search filters
Time frequency [freq] (1)
Transport infrastructure [tra_infr] (1)
Unit of measure [unit] (2)
Geopolitical entity (reporting) [geo] (234)

This dataset has 462 series:

[A.RL.KM.BG31] Annual – Total railway lines – Kilometre – Severozapaden
from
2012=642
to
2023=649
min:
642
max:
649
avg:
647.583
σ:
1.706
[A.RL.KM.BG32] Annual – Total railway lines – Kilometre – Severen tsentralen
from
2012=627
to
2023=626
min:
626
max:
627
avg:
626.917
σ:
0.276
[A.RL.KM.BG33] Annual – Total railway lines – Kilometre – Severoiztochen
from
2012=478
to
2023=486
min:
478
max:
486
avg:
483.833
σ:
2.075
[A.RL.KM.BG34] Annual – Total railway lines – Kilometre – Yugoiztochen
from
2012=662
to
2023=626
min:
624
max:
662
avg:
627.917
σ:
10.299
[A.RL.KM.BG41] Annual – Total railway lines – Kilometre – Yugozapaden
from
2012=885
to
2023=860
min:
860
max:
885
avg:
866.167
σ:
7.022
[A.RL.KM.BG42] Annual – Total railway lines – Kilometre – Yuzhen tsentralen
from
2012=776
to
2023=782
min:
772
max:
782
avg:
779.333
σ:
3.859
[A.RL.KM.CY00] Annual – Total railway lines – Kilometre – Kýpros
only NA values
[A.RL.KM.CYZZ] Annual – Total railway lines – Kilometre – Extra-Regio NUTS 2 (CYZZ)
only NA values
[A.RL.KM.CZ01] Annual – Total railway lines – Kilometre – Praha
from
2012=248
to
2023=210
min:
210
max:
248
avg:
234.25
σ:
14.019
[A.RL.KM.CZ02] Annual – Total railway lines – Kilometre – Střední Čechy
from
2012=1,277
to
2023=1,452
min:
1,277
max:
1,459
avg:
1,328.75
σ:
72.29